V2G UPDATE
Newsletter of the V2G Business, Policy & Technology Forum
V2X Funding & Interoperability

UK Opens £15 Million Competition to Scale Interoperable Bidirectional EV Charging

A new UK funding competition targets large-scale, real-world demonstrations of multiparty V2X interoperability, with grants for collaborative projects and a 2030 grid-flexibility objective.

November 17, 2026

UK Research and Innovation (UKRI) is inviting collaborative proposals for a funding competition worth up to £15 million to advance interoperable bidirectional electric-vehicle charging. The opportunity, published November 16, is intended to accelerate the delivery of EV flexibility to the UK electricity system by 2030 through vehicle-to-everything (V2X) technology.

The competition opened on November 10 and closes on January 27, 2027. It forms part of the Consumer Led Flexibility Challenge under the UK's Clean Energy Superpower Mission. UKRI says the broader mission aims to deliver at least 2 GW of additional peak-time consumer-led flexibility by 2030; the £15 million V2X competition is intended to contribute toward that target, not to deliver the full 2 GW on its own.

From isolated demonstrations to multiparty interoperability

UKRI is seeking solutions that work across multiple participants in the EV and electricity value chains rather than closed, single-provider systems. Supported projects must test multiparty interoperable V2X solutions against relevant standards, including ISO 15118-20, and demonstrate those solutions at meaningful scale in real-world, multi-season conditions.

Projects must generate evidence of the flexibility actually delivered under varying electricity demand, generation and market conditions. They must also publish non-confidential findings to build confidence among grid operators, users, investors and the wider industry. The call specifically emphasizes reliable, reproducible and cybersecure V2X products and services for both domestic and non-domestic settings.

AC and DC V2X technologies are eligible

The programme encompasses both AC and DC bidirectional charging, as well as low- and high-power, wired and wireless approaches, provided proposals can show multiparty interoperability at scale. Eligible use cases include vehicle-to-grid (V2G), vehicle-to-home (V2H), vehicle-to-building (V2B), vehicle-to-vehicle (V2V) and vehicle-to-load (V2L), including applications that strengthen energy-system resilience.

UKRI also requires evidence of user experience, EV battery state of health and the potential to scale beyond the funded deployment. It explicitly excludes small-scale pilots, feasibility studies, unidirectional-only charging projects and initiatives that cannot demonstrate multiparty interoperability. This shifts the emphasis from proving that energy can flow both ways to showing that solutions can work reliably across organizations and operating conditions.

Grant awards and consortium requirements

Individual proposals must request between £2 million and £7.5 million in grant support and run for 18 to 31 months. Projects must start by June 1, 2027, and conclude by December 31, 2029. A consortium must include a lead UK-registered business or research and technology organization plus at least two other organizations; it must demonstrate suitable energy-system expertise.

UKRI encourages involvement from automakers, charge-point providers, distribution network operators, energy suppliers, software and cybersecurity companies, fleet operators and end users. At least one technical consortium partner must participate, or become an active participant, in the International Energy Agency's Task 53 on interoperability of bidirectional charging. Awards remain competitive and subject to proposal quality and funding rules; the £15 million is an allocation ceiling, not a record of grants already awarded.

What the programme could mean for V2G commercialization

The competition provides a potential bridge between technical V2X demonstrations and utility-grade deployment evidence. Its requirements could help clarify whether cross-vendor combinations of vehicles, chargers, controls and electricity-market participants deliver predictable flexibility over time, and under what operating constraints.

For the wider V2G industry, the important outputs will be independently useful data: interoperability test results, delivered flexibility, operational performance and documented lessons. Those findings could inform future procurement, standards implementation and programme design, although project selections and actual results will not be known until the competition progresses.

Source: UK Research and Innovation, "Scaling interoperable V2X: bidirectional charging," published November 16, 2026. Read the original funding announcement and full competition requirements.